Circutor DHB Series Manual do Utilizador Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 54
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 6
7
3. BASIC REQUIREMENTS, OPERATIONAL
SAFETY
In the safety service scope, the meter meets the requirements of the EN
61010-1 standard.
Observations concerning the operational safety
· All operations concerning transport, installation, and commissioning
as well as maintenance, must be carried out by qualified, skilled
personnel, and national regulations for the prevention of accidents
must be observed.
· The programming of DHB-3xx meter parameters must be carried
out
after disconnecting measuring circuits
· Before switching the meter on, one must check the correctness of
connections to the network.
· Do not connect the meter to the network through
an autotransformer.
· Before removing the meter housing, one must switch the supply
off and disconnect measuring circuits.
· The removal of the meter housing during the guarantee contract
period may cause its cancellation.
· The meter fulfills requirements related to electromagnetic
compatibility in the industrial environment
· When connecting the supply, one must remember that a switch or
a circuit-breaker should be installed in the building. This switch
should be located near the device, easy accessible by the
operator, and suitably marked as an element switching
the meter off.
· Non-authorized removal of the housing, inappropriate use, incorrect
installation or operation, creates the risk of injury to personnel or
meter damage. For more detailed information, please study the
Vista de página 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 53 54

Comentários a estes Manuais

Sem comentários